27Ktrees

3,500 Protect Sudbury friends as of November 1st, 2016

4.3 miles – Portion of the entire 8.9 mile proposed project that will be in Sudbury, all of which will be above ground along the MBTA right-of-way in the current Eversource proposal. https://www.eversource.com/Content/ema-e/about/major-projects-infrastructure/sudbury-to-hudson-project

6 major road crossings – Some of the most iconic roads in Sudbury – Landham Road, Boston Post Road, Union, Horsepond, Peakham, Dutton Roads – will all be bisected by the transmission lines. See map on http://www.protectsudbury.org/faq/ (What is the Sudbury to Hudson Transmission Project).

>600 properties – Listed as direct abutters, adjacent to the right-of-way, or in an impacted neighborhood; >1800 properties – within 3,000 feet of the right-of-way; 1 – 30% – Impact on property values in Sudbury.  http://www.protectsudbury.org/research-news-2016-05-26/

4 protected conservation areas – Hop Brook Marsh, Memorial Forest, Assabet River National Wildlife Refuge, and Marlborough-Sudbury State Forest all abut the MBTA right-of-way and will be directly impacted by Eversource’s proposed Sudbury-Hudson Transmission Line project.  http://www.sudburyvalleytrustees.org/sites/default/files/MemorialForestBrochure.pdf

93 acres, 3825 linear feet of abutting property line – Hop Brook Marsh portion impacted by Eversource, which includes wetland, floodplain, meadow, forest. Bought by the town of Sudbury as conservation land in 1967, it is the most actively used of the town’s lands and abuts more residential properties in town than any other conservation land.  http://www.protectsudbury.org/wp-content/uploads/2016/03/sudburyeversourceletter.pdf

220 acres, 4,112 linear feet of abutting property line – Memorial Forest SVT portion that will be impacted by the Eversource project. See SVT’s letter to Eversource about their concerns about the project. http://www.protectsudbury.org/wp-content/uploads/2016/03/SVT-Letter-to-Eversource-03292016.pdf

900 acres – Total area of various connected conservation lands that will be impacted because the right-of-way bisects the land. Managing entities are the Mass. DCR, Federal ARNWR, SVT, Federation of Women’s Clubs, and the Marlborough, and Sudbury Conservation Commissions. http://www.protectsudbury.org/wp-content/uploads/2016/03/SVT-Letter-to-Eversource-03292016.pdf

60 acres of clearcut – the calculated acreage of trees that will be removed along Eversource’s proposed project, based on 82 foot clear cut; 26,795 trees to be removed – calculated based on USDA Forest Inventory Data Online (FIDO) tool. http://apps.fs.fed.us/fia/fido/index.html

7 birds, 2 amphibians, 2 beetles, 3 reptiles, and 10 plants – listed as endangered, threatened or of special concern species as classified by the Massachusetts Department of Agricultural Resources; 8 species of special concern – Sharp-shinned Hawk, Blue-spotted Salamander, Eastern Whip-poor-will, Fen Sedge, Cow Path Tiger Beetle,Common Moorhen, Wood Turtle, Eastern Box Turtle; 8 threatened species – Marbled Salamander, Eastern Red-bellied Tiger Beetle, Blanding’s Turtle, Slender Cottongrass, Leafy White Orchis, Long’s Bulrush, Swamp Oats, Britton’s Violet; 8 endangered species – American Bittern, Sedge Wren, Least Bittern, Heartleaf Twayblade, Lion’s Foot, Pied-billed Grebe, Pod-grass, Tall Nut-sedge.  http://www.mass.gov/eea/agencies/dfg/dfw/natural-heritage/species-information-and-conservation/town-species-viewer.html

8 Herbicides – currently approved for use as listed by Mass DAR on their Rights of Way Sensitive Area Materials List; Glyphosate, Metsulfuron Methyl, Sulfometuron Methyl, Ammonium Salt of Fosamine, Imazapyr, Triclopyr/Butoxy Ethyl Ester, Paclobutrazol. http://www.mass.gov/eea/agencies/agr/pesticides/rights-of-way-sensitive-area-materials-list.html

1.7 miles, 1 water source, 18,000 residents – Approximately 1.7 miles of the right-of-way is within the Zone II of Sudbury Water District’s gravel pack wells. The Sudbury Water District wrote of its concern about herbicide use in its letter to the Energy Facilities Siting Board “once contamination of groundwater occurs, it can be extremely costly to remove the contamination, if even possible.” 82 feet – The width of the scar on the landscape Eversource’s clearcut will leave along the route of its proposed Sudbury to Hudson transmission line project. http://www.protectsudbury.org/wp-content/uploads/2016/05/Sudbury-Water-District.pdf

82 feet clear cut: Sudbury Board of Selectman meeting with Eversource Feb. 2, 2016 minutes:  https://docs.google.com/viewerng/viewer?url=https://s3-us-west-2.amazonaws.com/cdn.sudbury.ma.us/wp-content/uploads/sites/260/2016/03/Eversource_Extract-from-BOS-02.02.16-Minutes.pdf?version%3Dd9e4990e3a88f04f0707d495fecf9319

100 feet – The height of the monopoles that Eversource proposes to erect along the MBTA right-of-way.  https://www.eversource.com/Content/docs/default-source/Tranmission/sudbury-hudson-faq.pdf?sfvrsn=4

115 kilovolts (kV) – the high voltage transmission wires the poles will carry.  https://www.eversource.com/Content/ema-e/about/major-projects-infrastructure/sudbury-to-hudson-project